Heavy civil contractors. Transportation builders working for state DOTs, transit agencies or toll authorities. Water and wastewater contractors on progressive design-build and CMAR jobs for utilities. Engineering firms with construction management or design-build groups. Energy contractors on transmission lines and substations.
Engineering and infrastructure
Highways and bridges, transit, water, power. Bigger contracts and longer jobs. Public owners. Delivery methods most building contractors rarely see.
Who hires
Seats
- Project Director
- Project Manager
- Construction Manager
- Area Superintendent
- Project Controls Director
- Estimating Manager
- Design-Build Manager
- Pursuit Director
- Quality Manager
Delivery
Design-bid-build and unit-price bidding still cover a lot of public work. Alongside them sit CM/GC, progressive design-build, and P3 concessions with availability payments on the biggest jobs.
Each one wants a different leader. A project director with ten years of low-bid DOT work knows how to hold a schedule and fight a claim. Before you put them on a progressive design-build, ask whether they’ve ever sat with a designer through a target price. Plenty haven’t.
Vertical to horizontal
Building contractors underestimate how different heavy civil is. Earthwork quantities and equipment fleets. Traffic control. Utility relocations. Railroad flagging. Prevailing wage, and DBE goals on federal money. A great vertical superintendent won’t automatically run a highway job, and we’ll say so when a client asks us to try.
NEC and the Irish contracts
UK infrastructure runs largely on NEC4, which brings its own vocabulary: early warnings, compensation events, the activity schedule. Commercial managers who know NEC properly are worth their rate. Irish transport and water programs run under the government’s public works contracts, and the senior people who know them are a small group.